PDF EndNote BibTex RIS Cite

Evaluation of Sh-5 and other Drillings Operation in Havza Geothermal Field

Year 2006, Volume 45, Issue 1, 0 - 0, 01.03.2006

Abstract

Success of drilling operation depends on technical details like the evaluation of earlier drilling operations on the same field, determination of drilling location, selection of suitable rig and equipment, proper well design, experienced personnel as well as finding the most drilling fluid type

HAVZA JEOTERMAL SAHASINDA YAPILAN SH-5 VE DİĞER SONDAJLARIN GENEL DEĞERLENDİRMESİ

Year 2006, Volume 45, Issue 1, 0 - 0, 01.03.2006

Abstract

Bir sahadaki sondaj çalışmalarının başarısı, sahada yapılmış olan daha önceki çalışmaların incelenmesi, bölge yeri tespiti, uygun makine ve ekipmanın seçilmesi, kuyu tasarımının yapılması, yeterli ve eğitimli personelin görevlendirilmesi ve en uygun sondaj sıvısı seçimi gibi teknik detaylar bağlıdır

Details

Other ID JA37UP59HH
Journal Section Research Article
Authors

Bülent TOKA This is me


Mehmet ŞAHİN This is me

Publication Date March 1, 2006
Submission Date March 1, 2006
Acceptance Date
Published in Issue Year 2006, Volume 45Issue 1

Cite

Bibtex @ { madencilik361226, journal = {Scientific Mining Journal}, issn = {2564-7024}, eissn = {2587-2613}, address = {Selanik Cad. No: 19/4 06650 Kızılay-Çankaya / ANKARA - TURKEY}, publisher = {Chamber of Mining Engineers of Turkey}, year = {2006}, volume = {45}, number = {1}, pages = {0 - 0}, title = {Evaluation of Sh-5 and other Drillings Operation in Havza Geothermal Field}, key = {cite}, author = {Toka, Bülent and Şahin, Mehmet} }
APA Toka, B. & Şahin, M. (2006). Evaluation of Sh-5 and other Drillings Operation in Havza Geothermal Field . Scientific Mining Journal , 45 (1) , 0-0 . Retrieved from http://www.mining.org.tr/en/pub/issue/32500/361226
MLA Toka, B. , Şahin, M. "Evaluation of Sh-5 and other Drillings Operation in Havza Geothermal Field" . Scientific Mining Journal 45 (2006 ): 0-0 <http://www.mining.org.tr/en/pub/issue/32500/361226>
Chicago Toka, B. , Şahin, M. "Evaluation of Sh-5 and other Drillings Operation in Havza Geothermal Field". Scientific Mining Journal 45 (2006 ): 0-0
RIS TY - JOUR T1 - Evaluation of Sh-5 and other Drillings Operation in Havza Geothermal Field AU - BülentToka, MehmetŞahin Y1 - 2006 PY - 2006 N1 - DO - T2 - Scientific Mining Journal JF - Journal JO - JOR SP - 0 EP - 0 VL - 45 IS - 1 SN - 2564-7024-2587-2613 M3 - UR - Y2 - 2023 ER -
EndNote %0 Scientific Mining Journal Evaluation of Sh-5 and other Drillings Operation in Havza Geothermal Field %A Bülent Toka , Mehmet Şahin %T Evaluation of Sh-5 and other Drillings Operation in Havza Geothermal Field %D 2006 %J Scientific Mining Journal %P 2564-7024-2587-2613 %V 45 %N 1 %R %U
ISNAD Toka, Bülent , Şahin, Mehmet . "Evaluation of Sh-5 and other Drillings Operation in Havza Geothermal Field". Scientific Mining Journal 45 / 1 (March 2006): 0-0 .
AMA Toka B. , Şahin M. Evaluation of Sh-5 and other Drillings Operation in Havza Geothermal Field. Mining. 2006; 45(1): 0-0.
Vancouver Toka B. , Şahin M. Evaluation of Sh-5 and other Drillings Operation in Havza Geothermal Field. Scientific Mining Journal. 2006; 45(1): 0-0.
IEEE B. Toka and M. Şahin , "Evaluation of Sh-5 and other Drillings Operation in Havza Geothermal Field", Scientific Mining Journal, vol. 45, no. 1, pp. 0-0, Mar. 2006

22562 22561 22560 22590 22558